Plan No.181010

Luxury Split-Level Deck With Conversation Pit

The railing and stair plans are included. There is a unique lower deck design with full tree, bench and stair plans. The upper deck is 12'x16' and the lower deck comes in three different sizes; 10'x12', 12'x14' and 14'x16'.

Total Finished Area: 0 sq. ft.

 – westhomeplanners.com
Full Rendering for Project Plan #181010
[Back to Search Results]