MENU

Plan No.183300

Childrens Playhouse

• Design Features: Columned Front Porch, Decorative Window Cut Outs with Shutters (no glass) • Plans Include: Rafter Cutting Templates, Door Construction Details, 3-D Cut-Away Drawings, Floor, Wall, and Roof Framing Plans Pricing Information: 1 Set of Prints: $29.95 Additional Sets: $9.95 each * PDF File: $29.95 * NOTE: If you order the PDF file, this plan will need to be printed on 24 x 36 inch paper to obtain the proper drawing scale. A local print shop should be able to accommodate you.

Total Finished Area: 0 sq. ft.

 – westhomeplanners.com
Full Rendering for Project Plan #183300
[Back to Search Results]