MENU

Plan No.182209

Gabled Sun Room Addition

This sun room addition features an 8/12 gable roof that attaches to an existing roof or to a 2-story-high wall. •8/12 Gable Roof Attaches to Existing Roof or Two-Story Wall •Includes 3 Sizes: 12'x12', 14'x14', 16'x16' •Foundation Type: Slab Pricing Information: 1 Set of Prints: $99.95 Additional Sets: $19.95 each * PDF File: $99.95 * NOTE: If you order the PDF file, this plan will need to be printed on 18 x 24 inch paper to obtain the proper drawing scale. A local print shop should be able to accommodate you.

Total Finished Area: 0 sq. ft.

 – westhomeplanners.com
Full Rendering for Project Plan #182209
 – westhomeplanners.com
Main Floor Plan for Project Plan #182209