MENU

Plan No.510500

Studio/Home Office with Victorian Details

Though simple in design, this smaller studio/home office provides all the right stuff for your workspace. A covered entry shelters the double-French door access to a two-room area. The smaller space features a nine-foot flat ceiling and is separated from the main studio area by a columned arch. The main area seems larger than it is thanks to a vaulted ceiling and two bumped-out windows. Define your own work area with furniture, or modify this design to include handy built-ins.

Total Finished Area: 288 sq. ft.

 – westhomeplanners.com
Full Rendering for Project Plan #510500
 – westhomeplanners.com
Main Floor Plan for Project Plan #510500
[Back to Search Results]