Plan No.182409
Two Level Deck With Angled Lower Corners
Plans include four deck sizes; 12'x8' upper deck with 18'x12' or 20'x12' lower deck and a 12'x10' upper deck with a 18'x12' or 20'x12' lower deck.
Total Finished Area: 0 sq. ft.
– westhomeplanners.com

833–493–0942