Plan No.187189
Split-Level Simply Fancy Deck
The stair, railing and optional bench plans are included. Sizes for the upper deck are 8'x12 or 8'x14'. There are four different sizes for the lower deck; 8'x12', 8'x14', 10'x12' and 10'x14'.
Total Finished Area: 0 sq. ft.
– westhomeplanners.com

833–493–0942