MENU

Plan No.185209

Children's Playhouse

Here is a versatile playhouse design that measures 4' x 8' x 6'-6" high. The very attractive traditional styling will make it a welcome addition in any yard. Features include: •Operable Shutters •Dutch Door with Decorative Window Grids (No Glass) •Plans Include: Floor, Wall & Roof Framing Plans, 3-D Cut-Away Drawings, Dutch Door Construction, Rafter Cutting Template and complete Materials List. Pricing Information: 1 Set of Prints: $29.95 Additional Sets: $9.95 each * PDF File: $29.95 * NOTE: If you order the PDF file, this plan will need to be printed on 24 x 36 inch paper to obtain the proper drawing scale. A local print shop should be able to accommodate you.

Total Finished Area: 0 sq. ft.

 – westhomeplanners.com
Full Rendering for Project Plan #185209
[Back to Search Results]